Baltica 2+3
The Baltica Offshore Wind Farm with a capacity of up to 2.5 GW will be developed in two stages: Baltica 2 and Baltica 3. The first stage, Baltica 3 (approximate capacity of 1 GW) is planned for 2026. The second stage, Baltica 2 (approximate capacity of 1.5 GW) will begin operations in 2027. Both stages will create the Baltica Offshore Wind Farm, which is presented here as Baltica 2+3.
Location
The Baltica Offshore Wind Farm will be developed in the Polish part of the Baltic Sea between Łeba and Ustka. The distance from the closest wind turbines to the shore will be at least 25 km. The land infrastructure necessary for the functioning of the Baltica Offshore Wind Farm will be located in Choczewo commune.